**April replace** The Good Meter Programme is in transition, and I wished to be upfront about what’s occurring.
I blogged in February about our sensible meter scenario, and wished to replace prospects on the most recent standing.
Briefly… we’re at the moment putting in sensible meters for precedence prospects, and hope to re-start the complete scale rollout in late April for “The South” and late Might for “The North”.
After I say precedence prospects, all prospects are a precedence – however on this case it’s those that urgently want a wise meter (akin to prospects with bodily necessities that make studying conventional meters troublesome), and those that are signing as much as tariffs which require them (Agile, Go and Outgoing).
A bit extra element…
The federal government mandated that as of March fifteenth solely SMETS2 meters will depend in direction of our “rollout obligations”. Which means we threat being fined for putting in SMETS1s, and that it’s laborious for us to fund SMETS1s as a result of the corporations who fund them are frightened {that a} future provider might select to satisfy its obligation by swapping SMETS1 for SMETS2.
Nonetheless, SMETS2 is simply not totally prepared for common rollout – and SMETS1 are getting near being upgraded in order that they are going to be nearly functionally equal to SMETS2. The important thing distinction is that SMETS1 don’t at all times at the moment keep sensible if you change provider, however that must be sorted inside a yr or so (SMETS1s will automagically get this functionality – it doesn’t want an engineer to go to or something like that).
We ordered SMETS2 meters about 6 months in the past, from one of many main producers. On the time, they’d been lab examined however not extensively examined within the area (it wasn’t doable to area take a look at then as a result of the meters couldn’t but totally join with DCC, the info firm on the core of SMETS2). Within the intervening interval, they – together with nearly all others – have been deemed to fail some technical assessments which impacted the reliability of sign. So these, like most different producers, have been delayed as they labored to amend the problems.
Nonetheless, we have been fortunate sufficient to satisfy a producer whose meters have been licensed they usually kindly allow us to have just a few batches of meters which had been earmarked for an additional provider. These are our preliminary SMETS2 meters for the South. With out this, we’d have been additional delayed as, together with most different suppliers, we’d be ready for brand new batches from factories.
So I’m delighted that we’re regaining some misplaced floor with these meters, and might see that we’ve an affordable probability of getting again as much as full velocity over the following couple of months.
Till then, we’ve a ready checklist for non-urgent prospects, and for these with pressing want we’ll match a SMETS2 the place doable in any other case a SMETS1. Be a part of the ready checklist right here, or get in contact with us in case you urgently want a wise meter put in now.
Beneath is my authentic weblog from February 2019.
The Good Meter Programme is in transition, and I wished to be upfront about what’s occurring.
Briefly: for February, March and possibly a bit longer, we aren’t capable of set up sensible meters as successfully as we have been doing till now.
To date, we have been putting in meters to the federal government’s “SMETS1” customary. These meters do all of the stuff we anticipate of sensible meters, however at the moment do not at all times keep sensible if you change power provider. More and more, that is much less of an issue, as suppliers have created options that allow them to remain sensible an increasing number of typically; and inside round 18 months, we anticipate the federal government to have upgraded its switching firm, DCC, to allow SMETS1 meters to work reliably after switching suppliers.
As of fifteenth March 2019 SMETS1 meters are now not thought of Ofgem compliant as the federal government forges on with its SMETS2 rollout.
These meters are designed to remain sensible if you change from the second they’re put in. Nonetheless, SMETS2 meters have been topic to a lot of delays and aren’t but totally out there, and it is honest to say that while SMETS2 is an improve, it is nonetheless very new and so the tech continues to be not fairly as easy to put in as SMETS1. We positioned contracts for SMETS2 meters months in the past, however have been suggested that supply dates aren’t being met for us or different suppliers. All of that is short-term – and we and the federal government and all the remainder of the sensible meter provide chain are working laborious to quickly get SMETS2 to the fitting place.
In consequence, we’ve a brief interval after we are taking a a lot decreased variety of bookings for sensible meter set up, and are unsure about precisely after we will probably be again on top of things.
Throughout this era we’re taking the next strategy:
- Quickly suspending any extra sensible meter bookings for dates after March fifteenth as a result of we can’t be positive what amount of SMETS2 meters we may have out there
- Prioritising SMET1 installs previous to then for individuals with further wants (emergencies, incapacity to learn a meter, mobility points, and so forth.) and those that’ve chosen tariffs which may solely equipped with a wise meter (Go, Agile)
- Honouring current bookings after March 15, and putting in whichever meter kind is a greater match for the property, case-by-case. Which implies some individuals may need a SMETS1 meter put in after the March fifteenth deadline. Not perfect, however we’ve to do what’s proper for patrons.
As an organization on the chopping fringe of sensible tariffs and know-how, this short-term scenario is as painful for us as it’s for patrons who need readability. The sensible meter transition is a colossal authorities programme and this transition interval, which will probably be brief, is a consequence. Nonetheless, we are actually, as a nation, very near realising the large alternatives opened up by sensible meters… and that’ll be an excellent factor.