Lahontan Gold Corp. (TSXV:LG)(OTCQB:LGCXF)(the “Firm” or “Lahontan“) is happy to announce outcomes from a optimistic Preliminary Financial Evaluation(” PEA”) on its flagship Santa Fe Mine gold-silver undertaking situated in Nevada’s prolific Walker Lane Pattern. The PEA was ready by Kappes, Cassiday & Associates (“KCA”) of Reno, Nevada with mine planning and manufacturing scheduling contributions from RESPEC Firm LLC (“Respec”), Reno, Nevada and mineral useful resource estimation by Fairness Exploration Consultants Ltd. (“Fairness”), of Vancouver, British Columbia, in accordance with Canadian Nationwide Instrument 43-101, Requirements of Disclosure for Mineral Tasks (“NI 43-101”).
PEA Highlights:
- Pre-tax Web Current Worth at a 5% low cost price (“NPV5”) of US$265.1 M with a 41.0% IRRwith an After-tax NPV5 of US$200.0 M with a 34.2% IRR using a $2,705/oz gold value and a $32.60/oz silver value (“spot steel costs”) (see spot steel value to base case steel value comparability in Desk 1).
- Complete Life-of-Mine (“LOM”) Pre-tax internet money circulate of US$373.3 M and After-tax internet money circulate of US$288.9 M over a nine-year undertaking life utilizing spot steel costs.
- Complete projected LOM income of US$930.8 M over a nine-year undertaking life utilizing spot steel costs.
- LOM strip ratio of just one.54 (waste to mineralized materials ratio).
- Estimated pre-production capital prices of US$135.1 M together with a 20% contingency, with a payback of two.9 years utilizing spot steel costs.
Kimberly Ann, Lahontan Gold Corp Govt Chair, CEO, President, and Founder commented: “Lahontan could be very excited in regards to the outcomes of the PEA: a low-capex, extremely worthwhile mining undertaking with a fast payback definitely bodes effectively for the way forward for Lahontan and all stakeholders. There’s appreciable potential to develop gold and silver assets, subsequently that is simply step one in restarting mining operations at Santa Fe. With mine allowing effectively under-way, focusing on a 2026 mine ground-breaking, the potential for the Firm to comprehend the financial outcomes outlined within the PEA could be very actual, particularly given present tendencies in gold and silver costs. Continued optimization of the mine plan, useful resource growth drilling, and refining the metallurgical circulate sheet are deliberate for 2025, in parallel with our allowing actions.”
The PEA is preliminary in nature, contains Inferred Mineral Sources which might be thought of too speculative geologically to have the financial issues utilized to them that may allow them to be categorized as Mineral Reserves, and there’s no certainty that the PEA will probably be realized. Mineral Sources that aren’t Mineral Reserves wouldn’t have demonstrated financial viability. The Firm has not outlined any Mineral Reserves on the Santa Fe Mine undertaking.
Financial Sensitivities
Sensitivity of the undertaking economics to metals costs is proven in Desk 1, displaying the bottom case steel costs used for the PEA, in addition to a low case, a excessive case and the spot case.
Desk 1: Santa Fe Mission 2024 PEA Economics
Low Case |
Base Case |
Excessive Case |
Spot Case (1) |
|
Gold Worth (US$/oz) |
1,800 |
2,025 |
2,200 |
2,705 |
Silver Worth (US$/oz) |
21.50 |
24.20 |
26.3 |
32.60 |
Web Income (US$) |
618.6 M |
696.2 M |
756.5 M |
930.8 M |
Pre-Tax NCF(2) (US$) |
65.0 M |
141.6 M |
201.2 M |
373.3 M |
Pre-Tax NPV5(3) (US$) |
21.7 M |
82.2 M |
129.2 M |
265.1 M |
Pre-Tax IRR(4) |
8.5% |
17.4% |
23.9% |
41.0% |
After-Tax NCF(2) (US$) |
47.8 M |
107.7 M |
154.1 M |
288.9 M |
After-Tax NPV5(3) (US$) |
8.7 M |
56.5 M |
93.3 M |
200.0 M |
After-Tax IRR(4) |
6.4% |
14.0% |
19.5% |
34.2% |
Payback Interval(5) (years) |
5.1 |
4.2 |
3.8 |
2.9 |
(1) As of December 10, 2024
(2) NCF means internet money circulate
(3) NPV5 refers to internet current worth at 5% low cost price
(4) IRR means inner price of return
(5) Pre-production capital, excluding sustaining capital
Capital Prices
Capital prices for the undertaking are summarized in Desk 2. Capital prices related to the mining operation had been estimated by RESPEC and primarily based on mining by contractor. Pre-stripping prices had been primarily based on the working prices mentioned under. Capital prices related to processing reminiscent of crushing, heap leaching and steel restoration, together with help and infrastructure prices related to laboratory, water and energy distribution and normal website companies had been estimated by KCA. Reclamation and closure prices of $12.5 M had been estimated by KCA.
Desk 2: Mission Capital Prices
Pre-Manufacturing (US$ M) |
LOM Sustaining (US$ M) |
|
Mining |
2.5 |
0.8 |
Processing, Help & Infrastructure |
116.0 |
17.0 |
Proprietor’s Prices |
5.3 |
0.0 |
Preliminary Fills |
0.5 |
0.0 |
Working Capital(1) |
10.7 |
0.0 |
TOTAL(2) |
135.1 |
17.8 |
- Working capital is credited in 12 months 9
- Values are rounded and will not sum completely
Working Prices
Working prices for the undertaking are summarized in Desk 3. Mining working prices had been estimated by RESPEC and primarily based on estimated anticipated gear hours and personnel necessities at a 25% markup for contractor charges. The off-road red-dye diesel gas value on this estimate was assumed to be $0.74/L. All different working prices had been estimated by KCA and primarily based on first rules on sure elements the place potential, reminiscent of reagent and energy consumption, together with benchmarking with comparable operations for different elements, reminiscent of labor, upkeep and discretionary bills
Desk 3: Mission Working Prices
LOM Complete (US$ M) |
Per Tonne Processed ($/t) |
|
Mining |
204.2 |
7.36 |
Processing |
138.7 |
5.00 |
Help & Infrastructure |
17.3 |
0.62 |
G&A |
35.8 |
1.29 |
TOTAL(1) |
402.5 |
14.28 |
(1) Values are rounded and will not sum completely
Mine Manufacturing Schedule
The PEA mine manufacturing schedule contains mining of leach materials and waste for the Santa Fe, Calvada, Slab, and York deposits. Leach materials was assumed to be despatched to a centralized crushing plant after which stacked on a leach pad and the waste materials was despatched to designed waste rock storage services (WRSF) or used as partial backfill into the Calvada pit.
As a result of the Santa Fe Mine is a brown-field undertaking, minimal pre-stripping is required to develop adequate stockpiles to feed the crusher. The mine manufacturing schedule requires 2 months of preproduction which begins within the Santa Fe deposit. The Calvada deposit is began in yr 2 and mined concurrently with Santa Fe. Calvada mining is adopted by mining of Slab and York deposits.
The method schedule was developed with a ramp up of manufacturing from yr 1 by yr 3 to a full 4.56 million tonnes per yr. Desk 4 exhibits the method manufacturing schedule.
Desk 4: Projected Manufacturing Abstract
12 months |
Tonnes Processed (kt) |
Gold Grade (g/t) |
Silver Grade (g/t) |
Gold Produced (koz) |
Silver Produced (koz) |
Gold Equal Produced(1) (koz) |
1 |
3,468 |
0.47 |
4.1 |
30.3 |
88.1 |
31.4 |
2 |
4,517 |
0.58 |
4.6 |
51.4 |
168.9 |
53.4 |
3 |
4,563 |
0.66 |
3.7 |
60.2 |
155.7 |
62.0 |
4 |
4,563 |
0.70 |
3.0 |
60.5 |
124.2 |
62.0 |
5 |
4,563 |
0.73 |
2.5 |
62.0 |
93.5 |
63.1 |
6 |
4,563 |
0.61 |
2.2 |
49.9 |
56.9 |
50.5 |
7 |
1,497 |
0.58 |
2.1 |
20.1 |
23.1 |
20.4 |
8(2) |
0 |
2.3 |
4.2 |
2.3 |
||
TOTAL(3) |
27,731 |
0.63 |
3.3 |
336.7 |
714.7 |
345.2 |
- Equal gold calculation relies on base case steel costs
- Residual leaching manufacturing solely
- Values are rounded and will not sum completely
Desk 5 exhibits the important thing manufacturing parameters for the mine and processing models used within the technology of the manufacturing and money circulate profiles.
Desk 5: Key Mining and Processing Manufacturing Parameters
LOM |
|
Mining |
|
Complete Waste Tonnes Mined (Mt) |
42.9 |
Complete Processed Tonnes Mined (Mt) |
27.7 |
Complete Tonnes Mined (Mt) |
70.6 |
Heap Restoration – Gold |
|
Santa Fe Oxide |
71% |
Santa Fe Transition |
49% |
Calvada Oxide |
71% |
Calvada Transition |
45% |
Slab Oxide |
50% |
York Oxide |
60% |
York Transition |
45% |
Heap Restoration – Silver |
|
Santa Fe Oxide |
30% |
Santa Fe Transition |
30% |
Calvada Oxide |
13% |
Calvada Transition |
0% |
Slab Oxide |
12% |
York Oxide |
0% |
York Transition |
0% |
Mining and Processing
The mineralized materials will probably be mined by normal open-pit mining strategies utilizing a contractor-owned and operated mining fleet consisting of 92-tonne haul vehicles and 11.5-m3 loading models and transported to the crushing circuit for processing.
Mineralized materials from the Santa Fe, Calvada, Slab and York deposits will probably be processed by typical heap leaching strategies. The nominal processing price will probably be 4.6 million tonnes each year or 12,500 tonnes per day. Three-stage crushing of the fabric to 12.7 mm, will probably be adopted by conveyor stacking on to a multi-lift heap leach pad. Dilute sodium cyanide answer will probably be utilized to the heap, with the pregnant gold and silver-bearing answer effluent from the heap being processed in a carbon adsorption-desorption-recovery (ADR) plant. Gold and silver will probably be produced within the type of doré bars from the on-site smelting course of.
Mineral Useful resource Estimation
The mineral useful resource estimate (“MRE”) was ready in accordance with the CIM Definition Requirements and Canadian Nationwide Instrument NI-43-101. The efficient date of the MRE ready by Fairness is October 9, 2024. The MRE is proven in Desk 6.
Desk 6: Mission-wide Sources, Santa Fe Mine, Mineral County, Nevada
Notes to Desk 6:
- Mineral Sources have an efficient date of October 9, 2024. The Mineral Useful resource Estimate for the Santa Fe Mine was ready by Trevor Rabb, P.Geo., of Fairness Exploration Consultants Ltd., an impartial Certified Individual as outlined by NI 43-101.
- Mineral Sources usually are not Mineral Reserves and wouldn’t have demonstrated financial viability. Inferred Sources are thought of too speculative geologically to have financial issues utilized to them that may allow them to be labeled as Mineral Reserves. An Inferred Mineral Useful resource has a decrease degree of confidence than that making use of to an Indicated Mineral Useful resource and should not be transformed to a Mineral Reserve. It’s fairly anticipated that a lot of the Inferred Mineral Sources could possibly be upgraded to Indicated Mineral Sources with continued exploration.
- Sources are reported in accordance with NI43-101 Requirements of Disclosure for Mineral Tasks (BCSC, 2016) and the CIM Definition Requirements for Mineral Sources and Mineral Reserves (CIM, 2014).
- Mineral Sources had been estimated for gold, silver, and gold equal (Au Eq) utilizing a mixture of extraordinary kriging and inverse distance cubed inside grade shell domains.
- Mineral assets are reported utilizing a cut-off grade of 0.15 g/t Au Eq for oxide assets and 0.60 g/t Au Eq for non-oxide assets. Au Eq for the aim of cut-off grade and reporting the Mineral Sources relies on the next assumptions gold value of US$1,950/oz gold, silver value of US$23.50/oz silver, and oxide gold recoveries starting from 45% to 79%, oxide silver recoveries starting from 10% to 30%, and non-oxide gold and silver recoveries of 71%, mining prices for useful resource and waste of US$2.50/t, processing value (oxide) US$3.49/t, processing value (non-oxide) US$25/t.
- An optimized open-pit shell was used to constrain the Mineral Useful resource and was generated utilizing Lerchs-Grossman algorithm using the next parameters: gold value of US$1,950/oz gold, silver value of US$23.50/oz silver, and promoting prices of US$29.25/oz gold. Mining prices for useful resource and waste of US$2.50/t, processing value (oxide) US$3.49/t, processing value (non-oxide) US$25/t, G&A value US$1.06/t. Royalties for the Slab, York and Calvada deposits are 1.25%, and most pit slope angles of fifty levels.
- Totals could not sum as a consequence of rounding.
Estimation Method: Lithology and gold and silver bearing domains had been modelled utilizing Leapfrog 2024. These domains are primarily outlined by logged jasperoid and limestone-breccia lithologies and continuity of gold grades above 0.1 g/t gold. Metallurgical domains for oxide, transition and non-oxide had been modelled primarily based on ratio of cyanide leachable gold assay values to fireside assay gold values along with drillhole logs recording abundance of pyrite and oxidation depth. Transition materials represents roughly 35% of oxide tonnes and comes virtually fully from the Santa Fe deposit. Transition area materials is included within the oxide useful resource. Domains representing lithology, weathering and mineralization fashions had been assigned to a block mannequin with a block measurement of 5 m x 5 m x 6 m. Common bulk densities consultant of the mineralization and lithology fashions had been assigned to the block mannequin and differ from 2.4 t/m3 to 2.6 t/m3.
Grade capping and outlier restrictions had been utilized to gold and silver values and interpolation parameters respectively. High minimize values for gold and silver had been evaluated for every area independently previous to compositing to 1.52 m lengths that honor area boundaries. Estimation was accomplished utilizing Micromine Origin with Strange Kriging (OK) and Inverse Distance cubed (ID3) interpolants. Blocks had been labeled in accordance with the 2014 CIM Definition Requirements. The nominal drillhole spacing for Indicated Mineral Sources is 50 m or much less. The nominal drillhole spacing for Inferred Mineral Sources is 100 m or much less.
Prospects for eventual financial extraction had been evaluated by performing pit optimization utilizing Lerchs-Grossman algorithm with the next parameters: gold value of US$1,950/oz gold, silver value of US$23.50/oz silver, promoting prices of US$29.25/oz gold. Mining prices for useful resource and waste of US$2.50/t, processing value (oxide) US$3.49/t, processing value (non-oxide) US$25/t, G&A value US$1.06/t. Royalties for the Slab, York and Calvada deposits are 1.25%. Most pit slope is 50 levels. Processing recoveries vary from 45% to 79% for oxide, silver recoveries vary from 10% to 30% for oxide and non-oxide gold and silver recoveries are 71%.
Extra info concerning the Santa Fe Mine undertaking’s MRE replace is included within the NI 43-101 Technical Report titled Santa Fe Mission Technical Report with an efficient date of October 9, 2024, Report Date: November 27, 2024*.
Certified Individuals
The certified individuals are Kenji Umeno, P.Eng. of Kappes, Cassiday & Associates; Thomas Dyer, P.E. of RESPEC; Trevor Rabb, P.Geo. and Darcy Baker, P.Geo. of Fairness Exploration Consultants Ltd. every of whom is an impartial “Certified Individual” below NI 43-101. A technical report supporting the outcomes disclosed herein will probably be printed inside 45 days. The efficient date of the technical report will probably be December 10, 2024.
About Lahontan Gold Corp.
Lahontan Gold Corp. is a Canadian mine growth and mineral exploration firm that holds, by its US subsidiaries, 4 top-tier gold and silver exploration properties within the Walker Lane of mining pleasant Nevada. Lahontan’s flagship property, the 26.4km2 Santa Fe Mine undertaking, had previous manufacturing of 356,000 ounces of gold and 784,000 ounces of silver between 1988 and 1995 from open pit mines using heap-leach processing (Nevada Division of Minerals, www.ndomdata.com). The Santa Fe Mine has a Canadian Nationwide Instrument 43-101 compliant Indicated Mineral Useful resource of 1,539,000 oz Au Eq(grading 0.99 g/t Au Eq) and an Inferred Mineral Useful resource of 411,000 oz Au Eq (grading 0.76 g/t Au Eq), all pit constrained (Au Eq is inclusive of restoration, please see Santa Fe Mission Technical Report*). For extra info, please go to our web site: www.lahontangoldcorp.com
* Please see the Santa Fe Mission Technical Report, Authors: Trevor Rabb, P. Geo, Darcy Baker, PhD, P. Geo., and Kenji Umeno, P. Eng., Efficient Date: October 9, 2024, Report Date: November 27, 2024. The Technical Report is obtainable on the Firm’s web site and SEDAR+.
On behalf of the Board of Administrators
Kimberly Ann
Founder, CEO, President, and Director
FOR FURTHER INFORMATION, PLEASE CONTACT:
Lahontan Gold Corp.
Kimberly Ann
Founder, Chief Govt Officer, President, Director
Cellphone: 1-530-414-4400
E mail: Kimberly.ann@lahontangoldcorp.com
Web site: www.lahontangoldcorp.com
Cautionary Notice Concerning Ahead-Trying Statements:
This information launch incorporates “forward-looking statements” and “forward-looking info” (collectively, “forward-looking statements”) throughout the that means of Canadian and United States securities laws, together with the USA Non-public Securities Litigation Reform Act of 1995. All statements, aside from statements of historic truth, are forward-looking statements. Ahead-Trying statements on this information launch relate to, amongst different issues: the Firm’s strategic plans; the outcomes of the PEA; the financial potential and deserves of the Mission; the estimated quantity and grade of mineral assets on the Mission; valuable metals costs; the PEA representing a viable growth possibility for the Santa Fe Mine undertaking (“the Mission”); the timing and particulars of the event phases as recognized within the PEA; estimates with respect to LOM, working prices, sustaining capital prices, capex, AISC, money prices, LOM manufacturing, processing plant throughput, NPV and after-tax IRR, payback interval, manufacturing capability and different metrics; the estimated financial returns from the Mission; mining strategies and extraction strategies; the exploration potential of the Mission and its inclusion in future mining research.
These forward-looking statements replicate the Firm’s present views with respect to future occasions and are essentially primarily based upon a number of assumptions that, whereas thought of cheap by the Firm, are inherently topic to vital operational, enterprise, financial and regulatory uncertainties and contingencies. These assumptions embody, amongst different issues: circumstances generally financial and monetary markets; tonnage to be mined and processed; grades and recoveries; costs for silver and gold remaining as estimated; forex trade charges remaining as estimated; reclamation estimates; reliability of the up to date MRE and the assumptions upon which it’s primarily based; future working prices; costs for vitality inputs, labor, supplies, provides and companies (together with transportation); the provision of expert labor and no labor associated disruptions at any of the Firm’s operations; no unplanned delays or interruptions in scheduled manufacturing; efficiency of obtainable laboratory and different associated companies; availability of funds; all obligatory permits, licenses and regulatory approvals for operations are acquired in a well timed method; the flexibility to safe and keep title and possession to properties and the floor rights obligatory for operations; and the Firm’s means to adjust to environmental, well being and security legal guidelines. The foregoing listing of assumptions is just not exhaustive.
Neither TSX Enterprise Trade nor its Regulation Providers Supplier (as that time period is outlined in insurance policies of the TSX Enterprise Trade) accepts accountability for the adequacy or accuracy of this launch. Aside from statements of historic truth, this information launch incorporates sure “forward-looking info” throughout the that means of relevant securities regulation. Ahead-looking info is ceaselessly characterised by phrases reminiscent of “plan”, “count on”, “undertaking”, “intend”, “consider”, “anticipate”, “estimate” and different comparable phrases, or statements that sure occasions or circumstances “could” or “will” happen. Ahead-looking statements are primarily based on the opinions and estimates on the date the statements are made and are topic to quite a lot of dangers and uncertainties and different components that might trigger precise occasions or outcomes to vary materially from these anticipated within the forward-looking statements together with, however not restricted to delays or uncertainties with regulatory approvals, together with that of the TSXV. There are uncertainties inherent in forward-looking info, together with components past the Firm’s management. The Firm undertakes no obligation to replace forward-looking info if circumstances or administration’s estimates or opinions ought to change besides as required by regulation. The reader is cautioned to not place undue reliance on forward-looking statements. Extra info figuring out dangers and uncertainties that might have an effect on monetary outcomes is contained within the Firm’s filings with Canadian securities regulators, which filings can be found at www.sedar.com